For the ground floor,we've heard a steady rhythm of hammering and drilling as new HVAC duct work has been installed, new electronic and data outlets wired, and backboard for tiles hung in the bathrooms. The upcoming week will feature insulation going into the walls, sheetrock/dry wall going up, and the bathroom walls getting tiled.
Perhaps best of all, the ground floor will now feature a water fountain (with a bottle filling station). You'll no longer have to head to the second floor to use our single water fountain. I think that's something we can all appreciate.